Fixed firefighting systems - Gas extinguishing systems - Part 1: Design, installation and maintenance (ISO 14520-1:2006, modified)
€135.00
Tests on electric and optical fibre cables under fire conditions - Part 3-23: Test for vertical flame spread of vertically-mounted bunched wires or cables - Category B
€61.00
Railway applications - Railway rolling stock power and control cables having special fire performance -- Part 2-2: Cables with crosslinked elastomeric insulation - Multicore cables
€74.00
Fire detection and fire alarm systems - Part 1: Introduction
€69.00
Smoke and heat control systems - Part 7: Smoke duct sections
€78.00
Smoke and heat control systems - Part 8: Smoke control dampers
€86.00
Fixed firefighting systems - Automatic sprinkler systems - Design, installation and maintenance
€182.00
Clothing for protection against heat and flame - Determination of contact heat transmission through protective clothing or constituent materials - Part 1: Contact heat produced by heating cylinder (ISO 12127-1:2015)
Safety rules for the construction and installation of lifts - Examination and tests - Part 58: Landing doors fire resistance test
Fixed firefighting systems - Gas extinguishing systems - Part 8: Physical properties and system design of gas extinguishing systems for IG-100 extinguishant (ISO 14520-13:2015, modified)
€59.00
Fixed firefighting systems - Gas extinguishing systems - Part 10: Physical properties and system design of gas extinguishing systems for IG-541 (ISO 14520-15:2015, modified)
Fire detection and fire alarm systems - Part 7: Smoke detectors - Point smoke detectors that operate using scattered light, transmitted light or ionization
€129.00
Fixed firefighting systems - Gas extinguishing systems - Part 1: Design, installation and maintenance (ISO 14520-1:2015, modified)
€149.00
Fixed firefighting systems - Foam systems - Part 2: Design, construction and maintenance
€0.00
Fixed firefighting systems - Water mist systems - Part 8 : test protocol for machinery in enclosures exceeding 260 m³ for open nozzle systems - Installations fixes de lutte contre l'incendie - Systèmes à brouillard d'eau - Partie 8 : protocole d'essai des systèmes à buses ouvertes pour machines situées dans des enceintes de plus de 260 m3