Test methods for external fire exposure to roofs
€184.00
Reaction to fire tests for building products - Building products excluding floorings exposed to the thermal attack by a single burning item
€50.00
Eurocode 4 - Design of composite steel and concrete structures - Part 1-2: General rules - Structural fire design
€205.00
Reaction-to-fire tests — Heat release, smoke production and mass loss rate — Part 1: Heat release rate (cone calorimeter method) and smoke production rate (dynamic measurement)
€187.00
Reaction-to-fire tests — Heat release, smoke production and mass loss rate — Part 1: Heat release rate (cone calorimeter method) and smoke production rate (dynamic measurement) — Amendment 1
€20.00
Fire resistance tests for service installations - Part 10: Smoke control dampers
Eurocode 6 - Design of masonry structures - Part 1-2: Structural fire design
Fire resistance tests for service installations - Part 9: Single compartment smoke extraction ducts
€163.00
Fire resistance tests for service installations - Part 8: Smoke extraction ducts
Fire containment — Elements of building construction — Part 1: Ventilation ducts
€145.00
Extended application of test results for fire resistance and/or smoke control for door, shutter and openable window assemblies, including their elements of building hardware - Part 2: Fire resistance of hinged and pivoted steel doorsets
Fire classification of construction products and building elements - Part 4: Classification using data from fire resistance tests on components of smoke control systems
Fire classification of construction products and building elements - Part 2: Classification using data from fire resistance tests, excluding ventilation services
Test methods for determining the contribution to the fire resistance of structural members - Part 6: Applied protection to concrete filled hollow steel columns
Test methods for determining the contribution to the fire resistance of stuctural members - Part 2: Vertical protective membranes