Mechanical vibration of non-reciprocating machines - Measurements on rotating shafts and evaluation - Part 4: Guidelines for gas turbine sets; identical with ISO 7919-4
€41.78
Specification for design and manufacture of water-tube steam generating plant (including superheaters, reheaters and steel tube economizers)
€421.00
Water-tube boilers and auxiliary installations In-service boiler life expectancy calculations
€201.00
€453.00
Mechanical vibration of non-reciprocating machines. Measurements on rotating shafts and evaluation criteria Land-based steam turbines generators in excess 50 MW with normal operating speeds 1500 r/min, 1800 3000 r/min 3600
Mechanical vibration. Evaluation of machine vibration by measurements on non-rotating parts Land-based steam turbines and generators in excess 50 MW with normal operating speeds 1500 r/min, 1800 3000 r/min 3600
Gas turbines and gas turbine sets. Measurement of emitted airborne noise. Engineering/survey method
€281.00
Mechanical vibration. Evaluation of machine vibration by measurements on rotating shafts Land-based steam turbines and generators in excess 50 MW with normal operating speeds 1500 r/min, 1800 3000 r/min 3600
Water-tube boilers and auxiliary installations General
Water-tube boilers and auxiliary installations Materials for pressure parts of accessories
Water-tube boilers and auxiliary installations Design calculation of pressure parts
Water-tube boilers and auxiliary installations Workmanship construction of pressure parts the boiler
Water-tube boilers and auxiliary installations Inspection during construction. Documentation marking of pressure parts the boiler
€329.00