IEC 60953-0:2022 Rules for steam turbine thermal acceptance tests - Part 0: Wide range of accuracy for various types and sizes of turbines
€470.00
IEC 60953-3:2022 Rules for steam turbine thermal acceptance tests - Part 3: Thermal performance verification tests of retrofitted steam turbines
IEEE Standard for Hydraulic Turbine and Generator Integrally Forged Shaft Couplings and Shaft Runout Tolerances
€161.00
IEEE Standard for Hydraulic Turbine and Generator Shaft Couplings and Shaft Runout Tolerances
€81.00
Water-tube boilers and auxiliary installations - Part 8: Requirements for firing systems for liquid and gaseous fuels for the boiler
€142.00
Water-tube boilers and auxiliary installations - Part 9: Requirements for firing systems for pulverized solid fuels for the boiler
Water-tube boilers and auxiliary installations - Part 16: Requirements for grate and fluidized-bed firing systems for solid fuels for the boiler
€121.00
Gas turbine applications - Safety (ISO 21789:2022)
€205.00
Water-tube boilers and auxiliary installations - Part 3: Design and calculation for pressure parts of the boiler
Mechanical vibration - Measurement and evaluation of machine vibration - Part 2: Land-based gas turbines, steam turbines and generators in excess of 40 MW, with fluid-film bearings and rated speeds of 1 500 r/min, 1 800 r/min, 3 000 r/min and 3 600 r/min (ISO 20816-2:2017 + Amd 1:2024)
€105.42
Chaudières à tubes d'eau et installations auxiliaires - Partie 17 : lignes directrices relatives à l'implication d'un organisme indépendant du fabricant
€80.00
Water-tube boilers and auxiliary installations - Part 7: Requirements for equipment for the boiler
€50.00
Water-tube boilers and auxiliary installations - Part 5: Workmanship and construction of pressure parts of the boiler
Water-tube boilers and auxiliary installations - Part 4: In-service boiler life expectancy calculations
Water-tube boilers and auxilliary installations - Part 3: Design and calculation for pressure parts