GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT. PART 6-7: TURBINE AUXILIARIES. MOISTURE SEPARATOR REHEATERS.
€75.00
Guide for procurement of power station equipment -- Part 4-8: Boiler auxiliaries - Dust handling plant.
€79.00
Guide for procurement of power station equipment -- Part 4-9: Boiler auxiliaries - Sootblowers.
Guide for procurement of power station equipment -- Part 6-4: Turbine auxiliaries - Pumps.
€85.00
Steam generator control - Furnace pressure control - Order recommendations
€22.52
Feedwater control for once-through boilers in fossil fired steam power stations
€67.01
Measures to reduce feed pumping energy by changing the pump speed for steam generators in fossil fired steam power stations
€57.48
Guidelines for testing control systems of steam turbines - Multi variable control of extraction turbines.
€83.18
Guidelines for testing control systems of steam turbines - Dynamic behaviour of speed and load control
€76.17
Feedwater control for once-through boilers in fossil-fired steam power stations.
Measures to reduce effort of the feed pump by changing the pump speed for boilers in fossil fired steam power stations.
Acceptance test guideline for steam turbine control systems
€41.59
Guidelines for testing control systems of steam turbines; compliance with the maximum allowable overspeed.
Guidelines for testing control systems of steam turbines; speed, frequency, power and pressure control.
€107.76
Steam generator control - Furnace pressure control