Guide for procurement of power station equipment -- Part 4-10: Boiler auxiliaries - Flue gas denitrification (De-NOx) plant.
€77.00
Guide for procurement of power station plant, equipment, and systems - Part 7-1: Pipework and valves - High pressure piping systems
€79.00
Guide for procurement of power station plant, equipment, and systems - Part 7-2: Pipework and valves - Boiler and high pressure piping valves
Guide for procurement of power station equipment - Part 2-4: Electrical equipment - Stationary batteries and chargers
€82.00
Guide for procurement of power station equipment - Part 2-4: Electrical equipment - High power static convertors
€78.00
Standard Terminology Relating to Protective Coating and Lining Work for Power Generation Facilities
This product is not for sale, please contact us for more information
Standard Specification for Design and Fabrication of Flue Gas Desulfurization System Components for Protective Lining Application
€58.00
Standard Guide for Specifying Thermal Performance of Geothermal Power Systems
€65.00
Standard Practice for Preservation by Freezing, Freeze-Drying, and Low Temperature Maintenance of Bacteria, Fungi, Protista, Viruses, Genetic Elements, and Animal and Plant Tissues (Withdrawn 2011)