Superseded , Confirmed Standard
Historical

ASTM C1188-91(1997)e1

Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities

Summary

1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities.

1.2 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use. 

1.3 The basic elements of a quality assurance program appear in the following order:

FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures ∧ Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20

Technical characteristics

Publisher American Society for Testing and Materials (ASTM International)
Publication Date 01/01/1991
Confirmation Date 12/10/1997
Collection
Page Count 8
Themes Fissile materials and nuclear fuel technology
EAN ---
ISBN ---
Weight (in grams) ---
No products.