Superseded
, Confirmed
Standard
Historical
ASTM C1188-91(1997)e1
Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities
Summary
1.1 This guide provides guidance and recommended practices for establishing a comprehensive quality assurance program for uranium conversion facilities.
1.2 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate health and safety practices and determine the applicability of regulatory limitations prior to use.
1.3 The basic elements of a quality assurance program appear in the following order:
FUNCTION SECTION Organization 5 Quality Assurance Program 6 Design Control 7 Instructions, Procedures ∧ Drawings 8 Document Control 9 Procurement 10 Identification and Traceability 11 Processes 12 Inspection 13 Control of Measuring and Test Equipment 14 Handling, Storage and Shipping 15 Inspection, Test and Operating Status 16 Control of Nonconforming Items 17 Corrective Actions 18 Quality Assurance Records 19 Audits 20Technical characteristics
| Publisher | American Society for Testing and Materials (ASTM International) |
| Publication Date | 01/01/1991 |
| Confirmation Date | 12/10/1997 |
| Collection | |
| Page Count | 8 |
| Themes | Fissile materials and nuclear fuel technology |
| EAN | --- |
| ISBN | --- |
| Weight (in grams) | --- |
No products.
Previous versions
01/06/2004
Withdrawn
, Confirmed
Most Recent
01/06/2004
Superseded
Historical
01/01/1991
Superseded
, Confirmed
Historical