Superseded
, Confirmed
Standard
Historical
IEEE 82:1963 (R1971)
IEEE Test Procedure for Impulse Voltage Tests on Insulated Conductors
Summary
New IEEE Standard - Superseded.
1.2.1 This Test Procedure applies only to impulse tests on insulated conductors. 1.2.2 This Test Procedure is not intended to replace any existing or future standards covering impulse generators, impulse testing or voltage measurements. It is intended to supplement such Standards by indicating specific procedures for a specific type of system component.
1.1.1 This Test Procedure is intended as a guide for impulse testing of insulated conductors.
1.1.2 It is intended only for use as a design or development test, and not as a routine production or specification test.
1.1.3 Special needs may require deviations from this Test Procedure. A uniform procedure, however, is desirable in most cases.
1.2.1 This Test Procedure applies only to impulse tests on insulated conductors. 1.2.2 This Test Procedure is not intended to replace any existing or future standards covering impulse generators, impulse testing or voltage measurements. It is intended to supplement such Standards by indicating specific procedures for a specific type of system component.
1.1.1 This Test Procedure is intended as a guide for impulse testing of insulated conductors.
1.1.2 It is intended only for use as a design or development test, and not as a routine production or specification test.
1.1.3 Special needs may require deviations from this Test Procedure. A uniform procedure, however, is desirable in most cases.
Notes
Superseded
Technical characteristics
No products.
Previous versions
08/12/2023
Active
Most Recent
03/03/2003
Withdrawn
, Confirmed
Most Recent
25/10/1994
Superseded
Historical
20/11/1963
Superseded
, Confirmed
Historical